电子工程世界电子工程世界电子工程世界

关键词

搜索

型号

搜索

C1206A111G2GAC7800

产品描述Ceramic Capacitor, Multilayer, Ceramic, 200V, 2% +Tol, 2% -Tol, BP, -/+30ppm/Cel TC, 0.00011uF, 1206,
产品类别无源元件    电容器   
文件大小160KB,共8页
制造商KEMET(基美)
官网地址http://www.kemet.com
下载文档 详细参数 全文预览

C1206A111G2GAC7800概述

Ceramic Capacitor, Multilayer, Ceramic, 200V, 2% +Tol, 2% -Tol, BP, -/+30ppm/Cel TC, 0.00011uF, 1206,

C1206A111G2GAC7800规格参数

参数名称属性值
是否Rohs认证不符合
Objectid926561381
包装说明, 1206
Reach Compliance Codenot_compliant
ECCN代码EAR99
YTEOL7.82
电容0.00011 µF
电容器类型CERAMIC CAPACITOR
介电材料CERAMIC
高度1.6 mm
JESD-609代码e3
长度3.07 mm
多层Yes
负容差2%
端子数量2
最高工作温度125 °C
最低工作温度-55 °C
封装形式SMT
包装方法TR, Plastic, 7 Inch
正容差2%
额定(直流)电压(URdc)200 V
系列C1206(BP,200V)
尺寸代码1206
温度特性代码BP
温度系数30ppm/Cel ppm/°C
端子面层Tin (Sn) - with Nickel (Ni) barrier
宽度1.52 mm

文档预览

下载PDF文档
CERAMIC HIGH RELIABILITY
GENERAL INFORMATION GR900 SERIES
HIGH RELIABILITY — GR900
GR900 capacitors are intended for use in any application where
the chance of failure must be reduced to the lowest possible
level. While any well-made multilayer ceramic capacitor is an
inherently reliable device, GR900 capacitors receive special
attention in all phases of manufacture including:
— Raw Materials Selection
— Special Designs
— Clean Room Production
— Individual Batch Testing
— C-SAM (when applicable)
— Singular Batch Identity is Maintained
— Destructive Physical Analysis
These parts are well worth the added investment in comparison
to the cost of a device or system failure.
Typical applications include:
Medical, Aerospace, Communication Satellites, Radar, Guidance
Systems.
SCREENING AND SAMPLE TESTS
Each batch receives the following testing/inspections:
Preliminary:
1. Destructive Physical Analysis: (DPA) - A sample is pulled from
each lot and examined per EIA-469 and KEMET’s strict internal
void and delamination criteria. Sampling plan is per MIL-PRF-123.
2. C-SAM - May be performed on batches failing to meet the
DPA criteria for removal of marginal product. Not required on
each lot.
Group A
1. Thermal Shock
— Materials used in the construction of mul-
tilayer ceramic capacitors possess various thermal coefficients of
expansion. To assure maximum uniformity, each part is temper-
ature cycled in accordance to MIL-STD-202, Method 107,
Condition A with Step 3 being 125°C. Number of cycles shall be
20 (100% of lot).
2. Voltage Conditioning
— One of the most strenuous environ-
ments for any capacitor is the high temperature/high voltage test.
All units are subject to twice-rated voltage to the units at the max-
imum rated temperature of 125°C for a minimum of 168 hours
and a maximum of 264 hours. The voltage conditioning may be
terminated at any time during 168 hours to 264 hours time inter-
val that confirmed failures meet the requirements of the PDA dur-
ing the last 48 hours of 1 unit or .4% (100% of lot).
Optional Voltage Conditioning (Accelerated Voltage
Conditioning)
— All conditions of the standard voltage condi-
tioning apply with the exception of increased voltage and
decreased test time. Refer to MIL-PRF-123 for the proper formula.
*Step 5 is performed on chips at this point (100% of lot).
3. Dielectric Withstanding Voltage
— 250% of the dc rated volt-
age at 25°C (100% of lot).
4. Insulation Resistance
— The 25°C measurement with rated
voltage applied shall be the lesser of 100 GΩ or 1000 megohm-
microfarads (100% of lot).
*5. Insulation Resistance
— The 125°C measurement with
rated voltage applied shall be the lesser of 10 GΩ or 100
megohm-microfarads (100% of lot). For chips, 125°C IR is per-
formed prior to Step 3 above.
6. Storage
at 150°C for 2 hours minimum without voltage applied
followed by a 12-hour minimum stabilization period (temperature
characteristic BX only).
7. Capacitance
— Shall be within specified tolerance at 25°C
(100% of lot). (Aging phenomenon is taken into account for BX
dielectric to obtain capacitance.)
8. Dissipation Factor
— Shall not exceed 2.5% for X7R (BX)
dielectric, 0.15% for C0G (BP) dielectric at 25°C. (100% of lot.)
9. Percent Defective Allowable (PDA)
— The overall PDA is 8%
for parts outside the MIL-PRF-123 values. The PDA is per MIL-
PRF-123 for all parts that are valid MIL-PRF-123 values. The PD
includes steps 1 through 8 above with the following exceptions.
Capacitance exclusion - capacitance values no more than 5% or
.5pF, whichever is greater for BX characteristic or 1% or .3pF,
whichever is greater for BP characteristic beyond specified toler-
ance limit, shall be removed from the lot but shall not be consid-
ered defective for determination of the PD.
Insulation Resistance at 25°C — Product which is not acceptable
for twice the military limit but is acceptable per the military limit,
is removed from the lot but shall not be considered defective for
determination of the PD.
10. Visual and Mechanical Examination
— Performed per MIL-
PRF-123 criteria.
11. Radiographic Examination (Leaded Devices Only)
Radial devices receive a one-plane X-ray.
12. Destructive Physical Analysis (DPA)
— A sample is exam-
ined on each lot per EIA-469. Sampling Plan is per MIL-PRF-123.
STANDARD PACKAGING
All products are packaged in trays except C512 capacitors which
are packaged 1 piece per bag.
DATA PACKAGE
A data package is sent with each shipment which contains:
1.
Final Destructive Physical Analysis (DPA) report.
2.
Certificate of Compliance stating that the parts meet all applic-
able requirements of the appropriate military specification to the
best failure level to which KEMET is approved.
3.
Summary of Group A Testing.
12
© KEMET Electronics Corporation • P.O. Box 5928 • Greenville, SC 29606 (864) 963-6300 • www.kemet.com
寻求TMS320C50 DSK的例程
最近搞一个项目,用的DSP 是TI九几年的一个DSP ,TMS320C50,手头没有相关的参考例程代码,在TI官网上也找不到其DSK的例程了,由于项目时间紧,如果有哪位曾经做过的,能否帮忙找一下曾经做过的 ......
许燕文 DSP 与 ARM 处理器
2012第二届中国国际分布式能源及储能技术设备展览会图片报道
3月29日上午阿牛哥去北京国家会议中心参加2012第二届中国国际分布式能源及储能技术设备展览会,看到了国电电力,华北电科院还有知名企业中兴,华为,浙江大立,日立,西门子等公司展台,还有知 ......
jameswangsynnex 能源基础设施
开发一个tcpsocket的服务器,供客户端升级下载升级文件
我目前在开发一个采用tcpsocket的服务器,供客户端下载文件更新。用QT实现。谁有具体的服务器代码或者例子给看下的。具体要求: 能接受多个客户端连接,可以对其进行管理 能核对客户端发送的 ......
laidawang Linux开发
for 语句中引用delay
//运行提示错误:) sbit Led=P1.0; if(k==4) { for(i=0;i...
newstudent stm32/stm8
求助:USART
我用2个MSP430做串口同步通信模式,主机发一串数据给从机,请问各位大大: 从机URXBUF收到一个数据后是否要清空才能接收下一个数据? 过程: URXBUF收完一个数据;IFG=1;中断服务中读出数 ......
1235421 微控制器 MCU
Quartus II 10.0 试用结论
最近试用了Quartus II 10,发现软件的界面发生了很大的变化,变得极其不人性了!最典型的就是“打开/保存文件”对话框,非常的恶心,这是QT和JAVA做的软件的通病。还有一些自动更名的功能没有了 ......
eeleader FPGA/CPLD

 
EEWorld订阅号

 
EEWorld服务号

 
汽车开发圈

 
机器人开发圈

About Us 关于我们 客户服务 联系方式 器件索引 网站地图 最新更新 手机版

站点相关: 大学堂 TI培训 Datasheet 电子工程 索引文件: 966  1311  256  923  1955  20  27  6  19  40 

器件索引   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

北京市海淀区中关村大街18号B座15层1530室 电话:(010)82350740 邮编:100190

电子工程世界版权所有 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号 Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved