2 or 3 poles breaking single phase, "L" Agency Code
Per Pole Rating
Must Have Agency Code "L"
Must Have Agency Code "L"
Must Have Agency Code "L"
Must Have Agency Code "L"
Must Have Agency Code "L"
Must Have Agency Code "L". 2 Pole Break Required for 250 Volts
Per Pole Rating
Must Have Agency Code "L"
Must Have Agency Code "L"
Must Have Agency Code "L" Parallel Pole
32
48
65
DC
DC
DC
---
---
---
0.02 - 100
110 - 150
0.02 - 70
---
0.02 - 70
---
0.02 - 70
---
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 100
0.02 - 100
---
---
0.02 - 100
0.02 - 50
51 - 100
0.02 - 100
0.02 - 50
---
---
---
71 -100
---
71 -100
---
71 -100
---
---
---
---
---
80 - 100
101 - 175
---
---
---
---
---
---
---
0.02 - 100
---
0.02 - 90
---
---
31 - 50
---
31 - 50
---
---
---
---
---
---
---
---
---
---
---
---
31 - 50
---
31 - 50
---
---
---
---
71 -100
---
71 -100
---
---
---
---
---
---
31 - 50
---
---
---
---
---
---
---
---
5000
5000
5000
5000
7500
7500
10,000
10,000
5000
5000
5000
80
80
125
125 / 250
250
125
150
SERIES
150
DC
DC
DC
DC
DC
50 / 60
DC
DC
---
---
---
---
---
1
---
---
---
---
---
---
---
---
---
---
---
---
5000
---
5000
---
5000
5000
5000
5000
5000
---
---
---
---
---
---
5000
5000
---
5000
5000
5000
5000
5000
5000
---
5000
5000
---
---
---
---
---
---
---
---
---
---
---
3000
5000
5000
5000
3500
3000
1000
5000
3500
5000
---
3000
---
5000
---
---
---
---
---
7500
3000
3500
3000
3500
3000
---
---
7500
---
---
---
---
---
---
7500
---
---
---
---
---
---
---
---
---
---
---
---
---
125 / 250
50 / 60
1
1
250
50 / 60
3
277
480 / 277
480
80
125
125 / 250
DUAL COIL
250
277
80
277
250
SHUNT
480 / 277
480
80
RELAY
277
250
65
80
125
SWITCH ONLY
125 / 250
250
277
480 / 277
50 / 60
50 / 60
DC
50 / 60
50 / 60
50 / 60
50 / 60
DC
50 / 60
50 / 60
DC
DC
50 / 60
50 / 60
50 / 60
50 / 60
50 / 60
50 / 60
50 / 60
50 / 60
DC
50 / 60
50 / 60
1
3
1
---
1
1
1
3
1
---
1
3
3
1
---
1
3
---
---
1
1
1
3
1
3
0.02 - 100
51 - 70
---
0.02 - 70
---
0.02 - 50
0.02 - 30
---
0.02 - 30
---
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 30
---
0.02 - 30
---
0.02 - 50
0.02 - 50
0.02 - 50
0.02 - 70
---
0.02 - 70
---
0.02 - 100
0.02 - 100
0.02 - 100
0.02 - 70
0.02 - 50
0.02 - 30
---
Notes for Table A:
1
Requires branch circuit backup with a UL LISTED Type K5 or RK5 fuse rated 15A minimum and no more than 4 times full load amps not to exceed 125A for 50 Amp or less rating and
not to exceed 175 for 51 through 100 Amp rating
*Manufacturer reserves the right to change product specification without prior notice.
Lists UL Recognized and CSA Accepted configurations and performance capabilities as a Manual Motor Controller.
RELAY
Notes for Table B:
1
UL recognized and CSA Accepted at 480V refers to 3 & 4 pole versions used in a 3Ø, wye connected circuit or 2-pole version connected with 2 poles breaking. 1Ø and backed up with
series fusing as stated above in note 1.
*Series, Shunt and Relay Trip - Voltage Coil Construction not current coils
Table C:
Lists UL Recognized, CSA Accepted , VDE and TUV Certified configurations and performance capabilities as a
Component Supplementary Protector.
Notes for Table C:
1
General Purpose ratings for UL/CSA only.
2
Requires branch circuit backup with a UL LISTED Type K5 or RK5 fuse rated 15A minimum and no more than 4 times full load amps not to exceed 125A for 50 Amp or less rating and
编译自semiengineering 业界越来越关注人工智能的功耗问题,但这个问题并没有简单的解决方案。这需要深入了解应用、半导体和系统层面的软件和硬件架构,以及所有这些的设计和实现方式。每个环节都会影响总功耗和提供的效用。这是最终必须做出的权衡。 但首先,必须解决效用问题。电力是否被浪费了?“我们将电力用于有价值的用途,”Ansys(现为新思科技旗下公司)产品营销总监 Marc Swi...[详细]