SCOPE
Content
This specification covers perform ance, tests and quality requirem ents for the AMP-LATCH* plug and
paddleboard, round conductor cable connector assem bly.
1.2.
Connector Assem bly Definitions
!
Plug: Pin contacts in housings crim ped to .050 inch centerline ribbon cable with 30, 28 or 26 solid
or 28 or 26 stranded AW G conductors. Com plete assem blies can be plugged or soldered into .100
by .300 or .100 by .600 inch centerline DIP sockets or printed circuit boards.
Paddleboard: Pin contacts in housings crim ped to .050 inch centerline ribbon cable with 30, 28 or
26 solid or 28 or 26 stranded AW G conductors. Com plete assem blies can be soldered to printed
circuit boards.
!
1.3.
Qualification
W hen tests are perform ed on the subject product line, procedures specified in AMP 109 series
specifications shall be used. All inspections shall be perform ed using the applicable inspection plan and
product drawing.
2.
APPLICABLE DOCUM ENTS
The following docum ents form a part of this specification to the extent specified herein. Unless
otherwise specified, the latest edition of the docum ent applies. In the event of conflict between the
requirem ents of this specification and the product drawing, the product drawing shall take precedence.
In the event of conflict between the requirem ents of this specification and the referenced docum ents,
this specification shall take precedence.
2.1.
TE Connectivity (TE) Docum ents
!
!
!
!
109-1: General Requirem ents for Test Specifications
109 Series: Test Specifications as indicated in Figure 1
114-40005: Application Specification
501-332: Qualification Test Report
3.
3.1.
REQUIREM ENTS
Design and Construction
Product shall be of the design, construction and physical dim ensions specified on the applicable product
drawing.
3.2.
Materials
!
!
!
Contact: Copper alloy
Cover: Black therm oplastic, UL94V-0
Housing: Black therm oplastic, UL94V-0
©2011 Tyco Electronics Corporation, | Indicates change
a TE Connectivity Ltd. Company
*Trademark
All Rights Reserved
TE logo is a trademark.
For latest revision, visit our website at www.te.com/documents.
For Regional Customer Service, visit our website at www.te.com
Other products, logos, and company names might be trademarks of their respective owners.
1 of 4
LOC B
108-40013
3.3.
Ratings
!
!
3.4.
Current: 1 am pere m axim um per contact
Tem perature: -65 to 105EC
Perform ance and Test Description
Product is designed to m eet the electrical, m echanical and environm ental perform ance requirem ents
specified in Figure 1. Unless otherwise specified, all tests shall be perform ed at am bient environm ental
conditions per Test Specification 109-1.
3.5.
Test Requirem ents and Procedures Sum m ary
Test Description
Requirem ent
Meets requirem ents of product
drawing and Application
Specification 114-40005.
ELECTRICAL
Procedure
Visual, dim ensional and functional
per applicable quality inspection
plan.
Exam ination of product.
Term ination resistance.
15 m illiohm s m axim um initial.
TE 109-6-1.
Subject sam ples to 50 m v
m axim um open circuit at 100 m a
m axim um .
See Figure 3.
TE Spec 109-28-4.
Test between adjacent contacts of
sam ples.
TE Spec 109-29-1.
Test between adjacent contacts of
sam ples.
Insulation resistance.
5000 m egohm s m inim um .
Dielectric withstanding voltage.
500 vac at sea level.
MECHANICAL
Solderability.
Vibration, random .
Contact tabs shall have m inim um
of 95% solder coverage.
TE Spec 109-11-1.
Subject contacts to solderability.
No discontinuities of 1 m icrosecond TE Spec 109-21-7.
or longer duration.
Subject m ated sam ples to 4.41 G's
See Note.
rm s between 5 to 500 Hz. 15
m inutes in each of 3 m utually
perpendicular planes.
No discontinuities of 1 m icrosecond TE Spec 109-26-1.
or longer duration.
Subject m ated sam ples to 50 G's
See Note.
half-sine shock pulses of 11
m illiseconds duration. 3 shocks in
each direction applied along 3
m utually perpendicular planes, 18
total shocks.
ENVIRONMENTAL
Physical shock.
Therm al shock.
See Note.
TE Spec 109-22.
Subject sam ples to 5 cycles
between -65 and 105EC.
Figure 1 (continued)
Rev A
2 of 4
108-40013
Test Description
Hum idity-tem perature cycling.
See Note.
Requirem ent
Procedure
TE Spec 109-23-3, Condition B.
Subject sam ples to 10 cycles
between 25 and 65EC at 95% RH.
TE Spec 109-43.
Subject sam ples to tem perature life
at 105EC for 1000 hours.
Tem perature life.
See Note.
NOTE
Shall meet visual requirements, show no physical damage and shall meet requirements of
additional tests as specified in Test Sequence in Figure 2.
Figure 1 (end)
3.6.
Product Qualification and Requalification Test Sequence
Test Group (a)
Test or Exam ination
1
2
3
4
5
Test Sequence (b)
Exam ination of product
Term ination resistance
Insulation resistance
Dielectric withstanding voltage
Solderability
Vibration
Physical shock
Therm al shock
Hum idity-tem perature cycling
Tem perature life
NOTE
(a)
(b)
3
3
3
4
4
5
1,6
2,5
1,5
2,4
1,5
2,4
2,6
3,7
2
1,8
1,3
See paragraph 4.1.A.
Numbers indicate sequence in which tests are performed.
Figure 2
Rev A
3 of 4
108-40013
4.
4.1.
QUALITY ASSURANCE PROVISIONS
Qualification Testing
A.
Sam ple Selection
Sam ples shall be prepared in accordance with applicable Instruction Sheets and shall be selected
at random from current production. Test group 1 shall consist of 6, 15 position and 6, 60 position
connectors. Test groups 2, 3, 4, and 5 shall each consist of 6, 60 position connectors.
B.
Test Sequence
Qualification inspection shall be verified by testing sam ples as specified in Figure 2.
4.2.
Requalification Testing
If changes significantly affecting form , fit or function are m ade to the product or m anufacturing process,
product assurance shall coordinate requalification testing, consisting of all or part of the original testing
sequence as determ ined by developm ent/product, quality and reliability engineering.
4.3.
Acceptance
Acceptance is based on verification that the product m eets the requirem ents of Figure 1. Failures
attributed to equipm ent, test setup or operator deficiencies shall not disqualify the product. W hen
product failure occurs, corrective action shall be taken and sam ples resubm itted for qualification.
Testing to confirm corrective action is required before resubm ittal.
4.4.
Quality Conform ance Inspection
The applicable quality inspection plan will specify the sam pling acceptable quality level to be used.
Dim ensional and functional requirem ents shall be in accordance with the applicable product drawing
and this specification.
Figure 3
Term ination Resistance Measurem ent Points
Rev A
4 of 4