电子工程世界电子工程世界电子工程世界

关键词

搜索

型号

搜索

1-1423162-7

产品描述OFF-DELAY RELAY, DPDT, MOMENTARY, PANEL MOUNT
产品类别机电产品    继电器   
文件大小973KB,共7页
制造商TE Connectivity(泰科)
官网地址http://www.te.com
下载文档 详细参数 全文预览

1-1423162-7在线购买

供应商 器件名称 价格 最低购买 库存  
1-1423162-7 - - 点击查看 点击购买

1-1423162-7概述

OFF-DELAY RELAY, DPDT, MOMENTARY, PANEL MOUNT

1-1423162-7规格参数

参数名称属性值
是否Rohs认证不符合
厂商名称TE Connectivity(泰科)
Reach Compliance Codecompliant
ECCN代码EAR99
Factory Lead Time8 weeks
Is SamacsysN
其他特性DELAY TIME = 3 CYCLE TO 120 CYCLE
主体宽度65.3 mm
主体高度71.9 mm
主体长度或直径114.8 mm
最大线圈电压(交流)120 V
触点(交流)最大额定R负载10A@240VAC
最大触点电流(交流)10 A
最大触点电压(交流)240 V
触点/输出电源类型AC
制造商序列号1423162
安装特点PANEL MOUNT
最高工作温度75 °C
最低工作温度-30 °C
物理尺寸114.8mm x 65.3mm x 71.9mm
参考标准CE; CSA; FM; UL
继电器动作MOMENTARY
继电器功能DPDT
继电器类型OFF-DELAY RELAY
表面贴装NO
端接类型SCREW
Base Number Matches1

文档预览

下载PDF文档
Specialty Relays
AGASTAT 7000 Series, Industrial Electropneumatic Timing Relay
Design & Construction
There are three main components of
Series 7000 Timing Relays:
Timing Head
circulates air through a
variable length to provide linearly
adjustable timing. Patented design pro-
vides easy adjustment and long service
life under severe operating conditions.
Precision-Wound Potted Coil
Total sealing without external leads
eliminates moisture problems, gives
maximum insulation value.
Snap-Action Switch Assembly
custom-designed over-center mecha-
nism provides snap action. Standard
switches are DPDT arrangement.
Each of these subassemblies forms
self-contained modules assembled at
the factory with the other two to afford
a wide choice of operating types, coil
voltages, and timing ranges.
The squared design with front terminals
and rear mounting permits the grouping of
Series 7000 units side-by-side in mini-
mum panel space. Auxiliary switches may
be added in the base of the unit, without
affecting the overall width or depth.
On-delay model 7012 (delay on pickup)
Applying voltage to the coil (L1-L2) for
at least 50 msec starts a time delay
lasting for the preset time. During this
period the normally closed contacts
(3-5 and 4-6) remain closed. At the end
of the delay period the normally closed
contacts break and the normally open
contacts (1-5 and 2-6) make. The
contacts remain in this transferred
position until the coil is deenergized,
at which time the switch returns to its
original position.
De-energizing the coil, either during or
after the delay period, will recycle the
unit within 50 msec.
It will then provide a full delay period
upon re-energization, regardless of how
often the coil voltage is interrupted
before the unit has been permitted to
"time-out" to its full delay setting.
Product Facts
n
n
Available in on-delay, true
off-delay, and on/off-delay
Timing from 0.1 seconds to
60 minutes, in linear
increments
Oversize adjustment knobs,
serrated with high-resolution
markings visible from all
angles makes the timer
easy to set timers
Inherent transient immunity
Standard voltages from
6-550VAC and 12-550VDC
(special voltages available)
Available in 2-pole or 4-pole
models
Numerous enclosure
options — explosion proof,
dust tight, watertight,
hermetically-sealed,
NEMA 1
Auxiliary timed and
instantaneous switches can
be added for greater
switching flexibility
Many mounting options —
Surface mount, Panel
mount, Octal plug-in
mounting
Options: quick-connect
terminals, dial stops, and
transient protection module
Easy-to-reach screw
terminals, all on the face of
the unit, clearly identified
Modular assembly —
timing head, coil assembly
and switchblock are all
individual modules, with
switches field-replaceable
File E15631,
File LR29186
R
R
n
Off-delay model 7022 (delay on dropout)
Applying voltage to the coil (for at least
50 msec) will transfer the switch,
breaking the normally closed contacts
(1-5 and 2-6), and making the normally
open contacts (3-5 and 4-6). Contacts
remain in this transferred position as long
as the coil is energized. The time delay
begins immediately upon de-energization.
At the end of the delay period the switch
returns to its normal position.
Re-energizing the coil during the delay
period will immediately return the timing
mechanism to a point where it will pro-
vide a full delay period upon subsequent
de-energization. The switch remains in
the transferred position.
n
n
Operation
Two basic operating types are available.
“On-Delay” models provide a delay period
on energization, at the end of which the
switch transfers the load from one set of
contacts to another. De-energizing the
unit during the delay period immediately
recycles the unit, readying it for another
full delay period on re-energization.
In "Off-Delay" models the switch trans-
fers the load immediately upon energiza-
tion and the delay period does not begin
until the unit is de-energized. At the end
of the delay period the switch returns to
its original position. Re-energizing the
unit during the delay period immediately
resets the timing, readying it for another
full delay period on de-energization.
No power is required during the timing
period, providing a true off delay.
In addition to these basic operating types,
“Double-Head” models offer sequential
delays on pull-in and drop-out in one
unit. With the addition of auxiliary
switches the basic models provide two-
step timing.
Note: Seismic & radiation tested
E7000 models are available.
Consult factory for detailed
information.
n
n
n
n
n
n
n
n
Note:
7032 types and certain models with accessories are not agency approved.
Users should thoroughly review the technical data before selecting a product part
number. It is recommended that users also seek out the pertinent approvals files of the
agencies/laboratories and review them to ensure the product meets the requirements
for a given application.
Consult factory for ordering information.
Dimensions are shown for
reference purposes only.
Specifications subject
to change.
Dimensions are in millimeters
unless otherwise specified.
USA: +1 800 522 6752
Asia Pacific: +86 0 400 820 6015
UK: +44 800 267 666
For additional support numbers
please visit www.te.com
12–8
Catalog 5-1773450-5
Revised 3-13
www.te.com
一个ADC的VREF问题..
看到一些帖子上说STM32,100+脚以上的会有VREF脚,以下的就没有了,,我用的是100脚的,是STM3210B的开发板,我量了下,VREF+怎么是8mv的?...
widb stm32/stm8
用DSP+FPGA做的数据采集系统
DSP TMS320F28335 FPGA EP3C16Q240 FPGA做ADDA的时序控制 DSP做处理 直接上图吧 253170 QQ956250037 ...
yicunyu DSP 与 ARM 处理器
TSD电路
请问什么是TSD电路呢? ...
梦溪开物 模拟电子
电子工程制图手册制图标准图例
电子工程制图手册制图标准图例...
呱呱 单片机
3kvdc跟地间安全距离多少?pcb上最小距离多少?
本信息来自合作QQ群:电子工程师技术交流(12425841) 群主在坛子ID:Kata各位大侠,遇到pcb布线问题。请教大家两个问题3kvdc跟地间的安全距离多少?pcb上的最小距离多少高压放电是高电势跟低电 ......
威海佟 PCB设计
几个问题求助
好久没发帖了,那就把最近攒的问题一起向网友求助下 1、有没有图片(含识别表情包功能、重复图片识别)重复识别软件? 微信、QQ现在有很多的垃圾,QQ用到现在已经达到20G,上万的图片视频 ......
sanhuasr 聊聊、笑笑、闹闹

 
EEWorld订阅号

 
EEWorld服务号

 
汽车开发圈

 
机器人开发圈

About Us 关于我们 客户服务 联系方式 器件索引 网站地图 最新更新 手机版

站点相关: 大学堂 TI培训 Datasheet 电子工程 索引文件: 1963  2287  880  209  2833  33  36  45  7  39 

器件索引   0 1 2 3 4 5 6 7 8 9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

北京市海淀区中关村大街18号B座15层1530室 电话:(010)82350740 邮编:100190

电子工程世界版权所有 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号 Copyright © 2005-2026 EEWORLD.com.cn, Inc. All rights reserved