电子工程世界电子工程世界电子工程世界

型号

产品描述

搜索
 

0525

器件型号:0525
器件类别:未分类   
厂商名称:OMRON
厂商官网:https://www.omron.com
下载文档

器件描述

ROCKER SWITCH

摇臂开关

参数

0525欧盟RoHS规范 Yes
0525状态 ACTIVE
0525制造商系列 A8A
0525开关类型 ROCKER SWITCH

0525器件文档内容

Omron Date Codes

                                                                                                            1
   Omron Date Codes

The vast majority of Omron ECB products use the date code as shown in Method
    A (next slide).

Products use date codes that are outlined on the following pages.

Method        Products
   A    Relay and Switches

B       Dip Switches A6S/A6T/A6R/A6RV/A6E/A6ER/A6H

C       Sensor and some switches EE-SX**/DC3

D       Automotive relays: G8J /G8JR/ G8JE/ G8SN/ G8W

E       Connector XC2/4

F       Connector XM2

G       Connector XS2

                                                                                2
              26X4H1
              }}

      Day of  The      The     Factory               Line
      the              Year                          Code
      Month   Months   Of      Code                  1-9
      01-31            The
              1:Jan    Decade  C:OMZ                 Digit
Method A      2:Feb    0-9     D:Iida                6&
              3:Mar            E:Takeo               7 (if used)
              4:April          H:OMI                 Is for
              5:May            K:Kusatsu             Factory
              6:June           N:OMR                 Production
              7:July           R:Krx                 Line
              8:Aug            W:OMB                 Number
              9:Sept           Y:OER
              X:Oct            Z:Izumo                           3
              Y:Nov
              Z:Dec

                  Example: 26X4H1= October 26, 2004
BY57E02
                             }

                         }

  Production       Date:                               The       The      Line
  Operator                                             Year               Code
  Code             Date  Code  Date  Code  Date  Code  Of        Months   1-9
                                                       The
   (Alphabetical)  1     1     11    C     21    N     Decade    1:Jan    Digit
                                                       0-9       2:Feb    6&
Method B           2     2     12    D     22    P               3:Mar    7 (if used)
                                                                 4:April  Is for
                   3     3     13    E     23    Q               5:May    Factory
                                                                 6:June   Production
                   4     4     14    F     24    R               7:July   Line
                                                                 8:Aug
                   5     5     15    G     25    S               9:Sept               4
                                                                 X:Oct
                   6     6     16    H     26    T               Y:Nov
                                                                 Z:Dec
                   7     7     17    J     27    U

                   8     8     18    K     28    V

                   9     9     19    L     29    W

                   10    A     20    M     30    X

                                           31    Y

                               Example: BY57E02 = July 31, 2005
                                     GX5

Date:                                   The                       The
                                                                  Year
Date      Code  Date  Code  Date  Code  Months                    Of
                                                                  The
1         1     11    C     21    N     1:Jan                     Decade
                                        2:Feb                     0-9
2         2     12    D     22    P     3:Mar
                                        4:April
3         3     13    E     23    Q     5:May
                                        6:June
4         4     14    F     24    R     7:July
                                        8:Aug
5         5     15    G     25    S     9:Sept
                                        X:Oct
6         6     16    H     26    T     Y:Nov
                                        Z:Dec
7         7     17    J     27    U

8         8     18    K     28    V

9         9     19    L     29    W

10        A     20    M     30    X

                            31    Y

Method C                          Example: GX5= October 15, 2005          5
              D5236

                                           }                                   See attached
                                                                           spreadsheet for full
                                                                           Julian dates listing.

     Shift    The     Julian       Julian   Date   Julian   Date   Julian   Date   Julian   Date
     Working  Year                 Date    1-Jan   Date    11-Jan  Date    21-Jan  Date    10-Feb
     Time:    Of      Date                 2-Jan     11    12-Jan    21    22-Jan    41    11-Feb
     D=Day    The                    1     3-Jan     12    13-Jan    22    23-Jan    42    12-Feb
     A=After  Decade  (see table)    2     4-Jan     13    14-Jan    23    24-Jan    43    13-Feb
     noon     0-9                    3     5-Jan     14    15-Jan    24    25-Jan    44    14-Feb
     N=Night                         4     6-Jan     15    16-Jan    25    26-Jan    45    15-Feb
                                     5     7-Jan     16    17-Jan    26    27-Jan    46    16-Feb
Method D                             6     8-Jan     17    18-Jan    27    28-Jan    47    17-Feb
                                     7     9-Jan     18    19-Jan    28    29-Jan    48    18-Feb
                                     8     10-Jan    19    20-Jan    29    30-Jan    49    19-Feb
                                     9               20              30              50
                                     10

              Example: D5236= August 24, 2005, Day Shift                                   6
               0525

                    }                                   See attached
               }                                    spreadsheet for full
                                                    Julian weeks listing.

       The     Week:   Week      DATE               Week      DATE
       Year    (2005)    1                            11
       Of                2                            12
       The               3   2                  8     13  13        20
       Decade            4                            14
       0-9               5   9                  15    15  20        26
                         6                            16
Method E                 7   16                 22    17  27        2
                         8                            18
                         9   23                 29    19  3         9
                         10                           20
                             1                  5         10        15

                             6                  12        17        23

                             13                 19        24        30

                             20                 26        1         7

                             27                 5         8         14

                             6                  12        15        21

               Example: 0525= June 13-17, 2005                          7
          5D01

                           }

          The     The      Sequential
          Year             Number
          Of      Months
          The
          Decade  A:Jan
          0-9     B:Feb
                  C:Mar
                  D:April
                  E:May
                  F:June
                  G:July
                  H:Aug
                  I:Sept
                  J:Oct
                  K:Nov
                  L:Dec

Method F  Example: 05D01= April, 2005  8
                        E95

Days:                   The                    The
                                               Year
F: The first ten days   Months                 Of
M: The middle ten days                         The
E: The last ten days    1:Jan                  Decade
                        2:Feb                  0-9
                        3:Mar
                        4:April                                  9
                        5:May
                        6:June
                        7:July
                        8:Aug
                        9:Sept
                        X:Oct
                        Y:Nov
                        Z:Dec

Method G  Example: E95= September 21-30, 2005
This datasheet has been downloaded from:
            datasheet.eeworld.com.cn

                 Free Download
           Daily Updated Database
      100% Free Datasheet Search Site
  100% Free IC Replacement Search Site
     Convenient Electronic Dictionary

               Fast Search System
             www.EEworld.com.cn

                                                 All Datasheets Cannot Be Modified Without Permission
                                                                Copyright Each Manufacturing Company

小广播

该厂商的其它器件

About Us 关于我们 客户服务 联系方式 器件索引 网站地图 最新更新 手机版

站点相关: 大学堂 TI培训 Datasheet 电子工程

北京市海淀区知春路23号集成电路设计园量子银座1305 电话:(010)82350740 邮编:100191

电子工程世界版权所有 京ICP证060456号 京ICP备10001474号 电信业务审批[2006]字第258号函 京公海网安备110108001534 Copyright © 2005-2017 EEWORLD.com.cn, Inc. All rights reserved